After-sales Service: | Spare Parts, Online/Onsite After Sale Service |
---|---|
Warranty: | 12 Months |
Processing Material: | Forest Products, Special Agricultural Products, Agronomic Products, Natural Ingredients |
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Fully-Automatic 8000BPH Orange/ /Tangerine Juice PET Bottle Beverage Packing Production Line | ||
No. | Item | Specification |
1 | Capacity | 8000BPH(500ml) |
2 | Suitable bottle volume | 250-2000ml |
3 | Material | Stainless steel304 |
3 | Water treatment capacity | 5000L/H |
4 | Water treatment filtering | Reverse Osmosis; quartz sand/active carbon/Security micro filters |
5 | Fully-Automatic Blowing Machine | PET;4/6 Cavities; Capacity:6000-8000BPH; 250-2000ml |
6 | Washing-filling-capping machine | Heads:24:24:8; 8000BPH; Full automatic |
7 | Wrapping machine | 6/8/12/16/24 bottles/bag as customer requirement; 6000BPH |
8 | Plant size | 800-1200m2 |
How to start a tangerine juice factory?
Step One: Analysis of feasibility study report!
Analysis of feasibility study report, which predicts the possible financial economic benefits and social environmental impacts after the completion of the project, is a systematic analysis method for the final comprehensive evaluation of project investment value. It carries out investigation, analysis and comparison from the aspects of technology, economy and engineering on construction content and development conditions of the project (Such as market demand, resource supply, construction scale, process route, equipment selection, environmental impact, financing, profitability, etc.).
Step Two: Shape your brand to be healthy living brand and shape the market!
Step Three: Reasonable and efficient production Design.
A reasonable and effective production line planning is the key to your long-term profitable operation of the plant. Contact us for the most suitable proposal!
Step Four: Equipment configuration
Not the cheapest! Not the top quality!
But just the suitable equipment production line that will help you acting or producing effectively with a minimum of waste, expense, or unnecessary effort.